Showing posts with label Indian Navy Submarine. Show all posts
Showing posts with label Indian Navy Submarine. Show all posts

Friday, May 9, 2014

Update on Project 75 - Indian Navy Scorpene Submarines

Project 75 has now become one of India's most closely guarded military projects, almost as inaccessible to outsiders as the nuclear ballistic missile submarine, INS Arihant, nearing completion in Visakhapatnam.

In a giant shed in the East Yard of Mazagon Dock Ltd, Mumbai (MDL), a 200-feet-long, cigar-shaped, metal cylinder is the first of six conventionally powered Scorpene submarines that the Indian Navy contracted to build with Franco-Spanish company, Armaris (since taken over by French shipbuilding major, DCNS).

The boat (as submariners call their vessels) is obviously close to completion - a small remaining gap at the rear will be filled by the section that holds the engine. Nearby, a second Scorpene is taking shape, metallic rings being welded together to form a hull. In the shed next door, a third vessel is racing towards completion.

MDL's current chairman, Rear Admiral (Retired) Rahul Shrawat - who inherited the Scorpene delay when he assumed charge of MDL - is upbeat. He promises the first submarine by September 2016, and to deliver the next five Scorpenes at nine-month intervals rather than the one-year intervals contracted.

Speaking to Business Standard, Shrawat promised: "We will launch the first Scorpene by September 2015 and deliver it to the navy within a year, i.e. by September 2016. The subsequent boats will be delivered at nine-month intervals, with the sixth and final vessel joining the fleet by June 2020.


Malaysian Scorpene ( Image Courtesy - militaryphotos_net )

Project 75 has created confidence about MDL's new ability to build submarines. The shipyard is readying to build a second line of six submarines under the new Project 75I, worth an estimated Rs 50,000 crore ($8.25 billion). Government sanction is being processed for Project 75I.

Rather than floating a global tender for Project 75I, Shrawat wants to take advantage of the experience and expertise gained during Project 75. Instead of having a fourth type of submarine in the navy's fleet (in addition to the Kilo-class; HDW and Scorpene), MDL sees the benefit in a more modern Scorpene with air independent propulsion (AIP) and land-attack missiles that the Project 75 vessels lack. Only the last two Project 75 vessels are slated to have AIP.

"Most naval policymakers would not consider it prudent to have a fourth type of conventional submarine in the fleet. I'm sure the government will feel the same. So, why not build more Scorpenes; improved with AIP and land attack missiles," says Shrawat.

Meanwhile, Indian defence shipyards are jostling fiercely for a share of Project 75I. The navy wants two submarines built abroad and inducted quickly into service, with the remaining four being built by MDL and the newly acquired defence shipyard, Hindustan Shipyard Ltd (HSL). But L&T cites its key role in building the nuclear submarine, INS Arihant, to argue that it should build at least one Project 75I submarine.

News Courtesy - business-standard.com

Saturday, September 28, 2013

Indian Navy: Tender for six Project 75-I Submarines

The Indian Navy is just one step away from issuing a global tender worth almost eight billion dollars for six conventional stealth submarines. Russia is among the four countries which are in a vantage position in bagging the upcoming contracts, the other countries being France, Sweden and Germany, though not necessarily in that order.

Indian Navy’s Vice Chief, Vice Admiral R K Dhowan, said at a press conference in New Delhi on Monday, September 16 that the navy’s proposal for having six hi-tech submarines will be soon placed before India’s apex decision-making body on defence and strategic matters the Cabinet Committee on Security (CCS).


A Lada class submarine at sea-trials ( Image Courtesy - defencetalk.com)

Vice Admiral Dhowan informed that the Defence Acquisition Council (DAC), headed by Defence Minister A K Antony, had given its approval for the proposal to be taken up before the CCS and the global tender will be issued after the CCS nod comes. The navy vice chief said the tender would be worth Rs 50,000 crore, which is about $7.92 billion at today’s exchange rates.

The Indian Navy plans a unique 2+2+2 format for adding the proposed six submarines to its fleet. Sources said the prevailing thought in the Indian Navy is to go for outright purchase of two submarines from abroad and order two submarines each for Indian public sector and private sector companies.

Vice Admiral Dhowan put this point in perspective with a pithy remark: “Navy is poised for growth... over the next decade, we plan to induct at least four to five major combatants (warships and frigates) every year. This provides an ideal opportunity for Indian shipyards and industry to enter into collaborative arrangements or joint ventures.”' Dhowan elaborated that 46 warships and submarines are currently under construction in Indian shipyards.

News Courtesy - indrus.in

Sunday, April 14, 2013

First Scorpene Submarine for Indian Navy by 2014

The first of the six Scorpene submarines ordered by the Indian Navy from French firm DCNS in 2005, will be rolled out by 2014, France's top diplomat in India said today. 

"The first submarine would be ready by 2014, heralding an important and strategic tie-up between both the nations on the defence front", said Francois Richier, Ambassador of France in India, adding the rest of five submarines would be delivered every subsequent year. 

"Such kind of submarines are important for Indian Navy considering the long coast it has to guard", he said. Richier is in Goa to visit French Destroyer 'FNS Montcalm' which is here as the part of training exercises with the Indian Navy. 



( Image Courtesy - militaryphotos.net ) 

"The induction of Scorpene submarines would enhance Indian Navy's capabilities to conduct exercises in the open sea. These are the latest generation of conventional submarines", a senior French naval officer said. 

Designed for defence against under-water threats, the 1,750-tonne submarine-submarine-killer (SSK) Scorpene is 67 meters in length and can dive to a depth of 300 meters. Ccording to French naval officials, the submarine can stay at sea for 45 days with a crew of 31. 

The standard version has six torpedo tubes and anti-shipping missile launchers.


News Courtesy - business-standard.com

Thursday, January 3, 2013

Indian Navy : Project 75-I Submarines - Progress Update

The Indian Navy is set to "very soon" issue a RFP (Request for Proposal) for a new line of six submarines with AIP (Air Independent Propulsion) capability. Project 75-I, has now being given firm clearance by the government, according to Indian Navy chief, Admiral DK Joshi.

Asked how soon is "very soon," the naval chief told India Strategic defence magazine (www.indiastrategic.in) that the Defence Acquisition Committee (DAC) had already cleared a note on Acceptance of Necessity (AON), the navy had finalized the RFP and it was in its last stage of formalities for clearance in the defence ministry.


Lada Class Submarine - Russia is offering export version of Lada (Amur) for Project 75-I
( Image Courtesy - submarinersworld.blogspot.com)

As per indications, the RFP for the submarines should be out even in January 2013, or latest by March before the financial year 2012-13 ends.

AIP increases the mission life of a submarine by around three times, depending upon the task and parameters required. The capability enables a submarine to generate air on-board without the need to surface for breathing to recharge its batteries.

The new Project 75-I submarines should be huge in value, estimated at around $10 billion-plus, depending upon the offsets and transfer of technology (ToT).

News Courtesy - ibnlive.in.com

Thursday, December 6, 2012

Project 75I - Indian Navy Submarines - Progress Report


Indian Navy has now turned its focus towards strengthening its undersea combat capabilities. Navy is now eyeing to acquire next generation submarines, under the Project 75I. According to a report by the Hindustan Times, the government is willing to spend more than $10 billion on Indian Navy’s undersea fleet. 

Confirming the development Navy chief Admiral DK Joshi said the Defence Ministry’s acquisition council had given the go-ahead for buying six submarines under a project codenamed P-75I. Joshi also stated that a global tender in this regard would be floated very soon.

Joshi said the new subs – bigger than the Scorpene – would be equipped with air-independent propulsion systems to recharge their batteries without having to surface for more than three weeks. “The submarines would also be equipped with land attack missile capability,” Defence Minister AK Antony informed the Lok Sabha. 


Lada Class Submarine - Russia is offering export version of Lada (Amur) for Project 75I
( Image Courtesy - submarinersworld.blogspot.com)

Currently, six Scorpene-class submarines are being built at the Mazagon Dock Ltd with technology from DCNS under a $4.3-billion ( Rs. 23,562 crore) project called P-75 

The Indian Navy’s existing submarine fleet consists of 10 Russian Kilo-class, four German HDWs and an Akula nuclear-powered attack submarine leased from Russia at $1 billion ( Rs. 5,500 crore). Apart from that INS Arihant is also expected to join the fleet by mid of 2013. At least two more vessels of Arihant class are in various stages of construction.

Indian Navy’s move to acquire next generation submarines is aimed at countering the threat emerging from China, which has more than 50 conventional submarines in its fleet, but nearly two-thirds of those are outdated. This means that only 20 Chinese submarines are advanced enough to be a serious threat for enemy warships.

News Courtesy - zeenews.india.com